90-Day Implementation Playbooks
Step-by-step guides for digital transformation success in your industry.
Proven frameworks, real results, zero guesswork.
Why Our Playbooks Work
Each playbook is built from real pilot implementations, refined through experience with 10+ manufacturers.
Proven Framework
Each playbook follows our proven 90-day methodology used by 10+ manufacturers
Industry Specific
Tailored to your industry's unique compliance, safety, and operational requirements
Time-Boxed
Clear milestones and deliverables for each week of your 90-day transformation
Step-by-Step
Detailed implementation guides with checklists, templates, and decision trees
Industry-Specific Playbooks
Choose the playbook designed for your industry's unique requirements and challenges.
Automotive Digital Transformation Playbook
Complete 90-day implementation guide for Tier 1 & 2 automotive suppliers focusing on just-in-time delivery and quality traceability.
Key Features:
- IATF 16949 compliance framework
- Poka-yoke integration strategies
- Supplier scorecard automation
- Real-time quality tracking
- Lean manufacturing optimization
Food & Beverage Production Playbook
Focused guide for production lines with strict safety, traceability, and yield optimization requirements.
Key Features:
- FDA compliance and validation
- Complete lot tracking system
- Yield optimization strategies
- HACCP integration points
- Allergen management protocols
Pharmaceutical Manufacturing Playbook
GMP environment guide requiring validated systems and complete batch traceability for regulatory compliance.
Key Features:
- 21 CFR Part 11 compliance
- Complete batch genealogy
- Validated system architecture
- Electronic batch records
- Change control procedures
90-Day Implementation Timeline
Every playbook follows our proven 4-phase approach to ensure measurable results.
Assessment
Days 1-14
Baseline measurement and bottleneck identification
Setup
Days 15-45
Reference architecture deployment and configuration
Optimization
Days 46-75
Process refinement and performance tuning
Results
Days 76-90
ROI measurement and expansion planning